![Lismullin Wastewater Treatment1](https://www.oreillyoakstown.co.uk/wp-content/uploads/2017/02/Lismullin-Wastewater-Treatment1--800x321.jpg)
Project: Super BAF Wastewater Treatment System
Location Navan, Co. Meath
In 2013 O’Reilly Oakstown Ltd were commissioned to design, build and install a 100PE Super BAF Wastewater Treatment System for Lismullen Conference Centre, Co. Meath
Description
Based on the EPA Recommended Wastewater Loading Rates, Table 3 the expected flows are as follows:
Hydraulic Loading 100 persons @ 180 litres/person/day = 18,000 litres/day Organic Loading 100 persons @ 60 BOD/person/day = 6,000g BOD/day