Lismullin Wastewater Treatment1

Project: Super BAF Wastewater Treatment System

Location Navan, Co. Meath

In 2013 O’Reilly Oakstown Ltd were commissioned to design, build and install a 100PE Super BAF Wastewater Treatment System for Lismullen Conference Centre, Co. Meath

Description

Based on the EPA Recommended Wastewater Loading Rates, Table 3 the expected flows are as follows:

Hydraulic Loading 100 persons @ 180 litres/person/day = 18,000 litres/day Organic Loading 100 persons @ 60 BOD/person/day = 6,000g BOD/day