![](https://www.oreillyoakstown.co.uk/wp-content/uploads/2018/06/Newcastle-house-1-845x321.png)
Project: Super BAF Wastewater Treatment System
Client: Newcastle House
Location: Newcastle House Hotel, Ballymahon, Co. Longford.
Lifting Contractor: Flynn Crane Hire & Transport.
Description:
In November 2017, O’Reilly Oakstown Ltd were commissioned to design, build and install a Super BAF Wastewater Treatment System based on EPA requirements of20BOD/30SS/20NH4N (as N)
- Max.Hydraulic Loading: 73.4m3/d.
- Max.BOD Loading: 22.9kg/d.
- Max.Ammonia Loading: 3.15kg/day.