Cork WWTS

Client: Virgo Construction Ltd.
Location: Meelin, Co. Cork.
Project: Wastewater Treatment System.

Description:

In April 2017, O’Reilly Oakstown Ltd were commissioned to design, build and install a Super BAF 20PE Concrete Wastewater Treatment system based on EPA requirements of 20BOD/30SS/20NH4N. Max Hydraulic Loading:3.0m3/d [20PE]. Max BOD Loading: 0.9kg/d [15PE]. Max Ammonia Loading: Not greater than 160g/day[20PE].